18 June 2015 is a red letter day: the centrepiece of the facility, the electrolysis system manufactured by Etogas, is scheduled for delivery. With a capacity of 600kW, this essential component will use renewable energy (sunflower) to generate 120Nm³ of hydrogen an hour.